Back to index page

CTRL contract 250 in UK near its completion.
GRINDEX pumps have been there all the way.

CTRL Contract 250 is a 5,3 km twin bore tunnel starting at Dagenham and running west towards Stratford. Tunneling for this Nuttall-Wayss and Fretag-Keir joint venture is now reaching its final stages. Grindex submersible drainage pumps have been there working since the start.

Text and images by permission from Euroflo Fluid Handling, UK Posted in June 2004
The press release is available in rtf-format. Rtf files can be handled by any word-processor and they do not carry viruses.
Press release Language File size
Euroflo_CTRL_250.rtf English 377 kb

GRINDEX pumps in CTRL contract 250 - images

Master N dewatering pump

9 x 12 cm
Master1.jpg
Master1.jpg
(1,2 MB)

Master N pump in a holding tank

9 x 12 cm
Master2.jpg
Master2.jpg
(1,2 MB)

Below: Master N-pump modified with tandem connection to boost the flow

12 x 9 cm
Master-tandem1.jpg
Master-tandem1.jpg
(1,0 MB)

9 x 12 cm
Master-tandem2.jpg
Master-tandem2.jpg
(1,0 MB)

How to read the image information
Please read the technical info before downloading the images.

©  Copyrights  ©
All images are property of Grindex. They can be downloaded and used
for free by newspapers, magazines and other publishing companies.