|
Lifting the second MAXI
pump to its location
15 x 10 cm

Bypass1-1.jpg
(2,1 MB) |
Securing the second MAXI
pump
at its location
15 x 10 cm

Bypass1-2.jpg
(2,0 MB) |
Securing the hose
for the
second MAXI
pump.
10 x 15 cm

Bypass1-3.jpg
(1,9 MB) |
The two MAXI pumps
at work, by-
passing the tunnel. The tunnel is
now kept dry by these two pumps.
25 x 35 cm

Bypass1-4.jpg
(7,5 MB) |
|
The two MAXI pumps at work.
The icy, frozen water does
not
affect the pumping.
10 x 15 cm

Bypass1-5.jpg
(1,8 MB) |
Upstream view. The temporary
barrage is clearly visible at the
bottom-left part of this image.
20 x 30 cm

Bypass1-6.jpg
(3,6 MB) |